Re Bid Beale Street Landing Deferred Maintenance Phase II

Property upgrades and modifications to the Beale Street Landing facility, including but not limited to the installation of a new debris baffle system within the Wolf River Harbor, walkway demolition, grading, landscaping, guardrail removal, fencing installation, and building envelope improvements.
Bid Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
001 COVER 331.2 KB
002 B—1.0 174.9 KB
003 B—1.1 232.8 KB
004 B—2.0 477.2 KB
005 B—2.1 179.3 KB
006 B—2.2 161.7 KB
007 B—2.3 164.6 KB
008 B—2.4 155.8 KB
009 B—2.5 150.7 KB
010 B—2.6 146.4 KB
011 B—3.1 404.0 KB
012 B—3.2 398.0 KB
013 B—3.4 418.9 KB
014 B—3.3 543.6 KB
015 B—4.1 418.1 KB
016 B—5.1 254.3 KB
017 B—5.2 197.0 KB
018 C1.0 2.6 MB
019 C2.0 2.8 MB
020 C3.0 4.7 MB
021 C4.0 4.6 MB
022 C4.1 4.6 MB
023 L-001 611.8 KB
024 L-500 2.5 MB
025 L-550 296.1 KB
026 L-900 450.2 KB
027 L-901 297.3 KB