UTHSC Campus Fencing

1. coordinate all demolition and construction work with campus authority. 2. verify existing conditions on site and locate all utilities via campus authority and mlgw prior to the commencement of any demolition or construction work. 3. notify campus authority and architect of discovered discrepancies/conflicts between construction documents and actual observed existing conditions prior to the commencement of work. 4. protect existing landscaping as much as feasible via hand excavation. 5. exact banner post locations to be verified on site by architect at the time of installation for visibility and siteline purposes. 6. demolition of existing chain link fencing to include removal of existing fence posts and footings, typical. 7. removal of bollards and cable to include grinding posts smooth and level with surrounding grade.
Bid Documents (click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
001 G000 723.8 KB
002 A001 787.1 KB
003 A011 425.0 KB
004 A101 455.0 KB
005 A102 447.6 KB
006 A103 377.9 KB
007 A104 519.8 KB
008 A105 347.3 KB
009 A106 495.3 KB
010 A107 329.5 KB
011 A108 392.2 KB
012 A109 338.8 KB
013 A110 433.3 KB
014 A111 342.9 KB
015 A112 451.8 KB
016 A113 395.0 KB