Somerville Connected Community Facility

The work of this contract comprises of: 1. Selective Demolition 2. Miscellaneous Steel 3. New Casework / Millwork 4. Selective Roof Patching (where mechanical units are removed) 5. Interior Doors / Frames / Hardware 6. Exterior Storefront Systems 7. New Interior Finishes 8. Exterior Concrete Resurfacing System 9. New Restroom Partitions 10. Fixed Tiered Classroom Furniture 11. New Mechanical and Plumbing Systems 12. New Electrical Systems
Bid Documents (click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
001 COVER 693.2 KB
002 C1.0 1.6 MB
003 LS1.1 7.5 MB
004 LS1.2 1.3 MB
005 A0.1 1.3 MB
006 A1.0 23.6 MB
007 A1.1 1.0 MB
008 A1.2 1.0 MB
009 A1.3 1.0 MB
010 A1.4 784.3 KB
011 A2.1 1.3 MB
012 A2.2 1.0 MB
013 A2.3 8.3 MB
014 A3.1 819.7 KB
015 A5.1 955.3 KB
016 A6.1 763.9 KB
017 S1.0 10.2 MB
018 S1.1 831.7 KB
019 S2.0 927.6 KB
020 S3.0 955.1 KB
021 S3.1 786.0 KB
022 M0.1 322.9 KB
023 M1.1 725.1 KB
024 M1.2 460.9 KB
025 P0.1 299.7 KB
026 P1.1 763.7 KB
027 P2.1 501.1 KB
028 E0.1 469.5 KB
029 E1.1 352.4 KB
030 E2.1 486.2 KB
031 E3.1 496.2 KB
032 E4.1 443.4 KB
033 FP0.1 473.4 KB
034 FP1.1 503.3 KB