Whitehaven Clinic Construction

The building is designed to be self-supporting and stable after it is fully completed. It is solely the contractor's responsibility to determine erection procedure and sequence and to ensure the stability of the buildings and their component parts during construction. This includes the addition of whatever shoring, sheeting, temporary bracing, guys, or tie downs which may be necessary.
Addenda (click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
SB-I000928 Addendum No. 1 2.5 MB
SB-I000928 Addendum No. 2 24.2 MB