STCC Maxine Smith Campus Chiller Replacement
1. Remove existing 250-Ton Rotary Screw Air -Cooled Water Chiller and above grade chilled water piping as noted and detailed on the contract documents. 2. Furnish and install replacement 250-Ton Rotary Screw Air-Cooled Water Chiller as noted and detailed on the contract documents. 3. Furnish and install new above grade insulated chilled water piping, fittings, valves, components, controls and instrumentation, as noted and detailed on the contract documents. 4. Remove and replace electrical power wiring and components for chiller replacement as noted on the contract documents.
Bid Documents
(click to expand/collapse)
(click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
| Name | Size | |||
| 001 COVER | 1.2 MB | |||
| 002 ME-120 | 457.6 KB | |||
| 003 ME-130 | 558.4 KB | |||
| 004 M-501 | 1.0 MB |


