Violent Crimes Renovation 51 Flicker St.
Project consists of: includes interior modifications and a roof replacement. The interior modifications are to update the existing restrooms to meet ADA requirements, reconfigure the breakroom layout, and updating finishes. The roof replacement will be a full existing roof tear off. The new roof is to be a 60 mil TPO membrane system.
Addenda
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum No. 1 | 14.3 MB |


