East Shelby Library Erosion Control
This project includes the Construction for the restoration of the earthen bank between an existing stream and the west side of the building; and the relocation of the stream to its location at the the time the library was built including, but not limited to earthwork, gabion baskets, etc.
Addenda
(click to expand/collapse)

Name | Size | |||
SB-I000918 Addendum No. 1 | 273.9 KB |