East Shelby Library Erosion Control

This project includes the Construction for the restoration of the earthen bank between an existing stream and the west side of the building; and the relocation of the stream to its location at the the time the library was built including, but not limited to earthwork, gabion baskets, etc.
Addenda (click to expand/collapse)
Name Size
SB-I000918 Addendum No. 1 273.9 KB