Beale Street Landing Deferred Maintenance Phase Two

Project consists of: Property upgrades and modifications to the Beale Street Landing facility, including but not limited to the installation of a new debris baffle system within the Wolf River Harbor, walkway demolition, grading, landscaping, guardrail removal, fencing installation, and building envelope improvements.
Bid Documents (click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
001 COVER 331.6 KB
002 C1.0 2.6 MB
003 C2.0 2.8 MB
004 C3.0 4.7 MB
005 C4.0 4.6 MB
006 C4.1 4.6 MB
007 L-001 612.2 KB
008 L-500 2.5 MB
009 L-550 296.6 KB
010 L-900 450.6 KB
011 L-901 297.7 KB
012 B-1.0 236.0 KB
013 B-1.1 293.9 KB
014 B-2.0 538.3 KB
015 B-2.1 240.4 KB
016 B-2.2 222.8 KB
017 B-2.3 225.7 KB
018 B-2.4 216.9 KB
019 B-2.5 211.8 KB
020 B-2.6 207.5 KB
021 B-3.1 465.1 KB
022 B-3.2 459.1 KB
023 B-3.3 604.7 KB
024 B-3.4 480.0 KB
025 B-3.5 485.2 KB
026 B-4.1 479.2 KB
027 B-5.1 315.4 KB
028 B-5.2 258.0 KB