Town of Collierville Eastbrook Trail Improvements
1. Project Description This project consists of repairing, patching and overlaying the trail as well as the installation of additional drainage pipes and structures. Also included with this project is an alternative option which includes substituting concrete and a wooden boardwalk for a portion of the asphalt trail.
Bid Documents
(click to expand/collapse)

Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
Bid Envelope Front-Const | 57.2 KB | |||
TC2025-40 Bid Distribution Form | 247.5 KB | |||
TC2025-40 Formal Notice of Release | 219.8 KB | |||
TC2025-40 Invitation to Bid | 2.0 MB |