Levee Road Roof Replacement

Remove 1 layer of existing roofing system down to the decking. · Inspect decking and repair all areas as needed. · Install insulated boards · Build valleys in low areas where ponding occurs sowater will flow towards roof top drains. · Install new 1 layer of 1/4" Dens deck. · Prep roof for installation of new 60 mil White TPO roof system. · Install new 2"X 3" clad metal drip edge around perimeter of roof. · Install new flashing around all pipes. · Install a new 60 mil TPO Membrane, fastened with seam plates and #15 screws in accordance with the manufacturer's written specifications. · Remove all debris caused by roof work and dispose at proper landfill.
Bid Documents (click to expand/collapse)
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
Specifications 1.0 MB