MLGW McCord Mechanical Maintenance Building

Install a water service line and water meter to the point of connection shown on the drawings; electric service line, conduit, pad, pad-mount transformer and meter-set to the point of connection shown on the drawings; conduit and telecommunications lines to the point of connection shown on the drawings; security entrance equipment inside the pre-engineered metal building at each door.
Addenda (click to expand/collapse)
Name Size
Addendum 1 - 12605 324.6 KB